Carlee Kremer

What Facility Owners Should Do Now

The biggest shift in today’s environment is convergence. Building systems are no longer independent decisions. HVAC impacts compliance. Energy impacts operating budgets. Plumbing impacts health risk. Automation impacts uptime and cybersecurity. What has changed is not just the technology. It is the level of consequence. A decision in one system now creates ripple effects across […]

What Facility Owners Should Do Now Read More »

Building Connections in the Dayton Manufacturing Community

Recap of the DRMA Happy Hour at Mechanical Services & Design On March 12, Mechanical Services & Design (MSD) had the pleasure of hosting the Dayton Region Manufacturers Association (DRMA) Happy Hour, welcoming members of the regional manufacturing community to our facility for an evening of networking, conversation, and collaboration. DRMA has served as the

Building Connections in the Dayton Manufacturing Community Read More »

Fire, Ice & Good Times

Another unforgettable Fire & Ice season has officially wrapped up along the riverbanks at Moerlein Lager House, and Mechanical Services and Design was thrilled to be part of it! Over the past couple of weeks, this iconic Cincinnati event brought together great food, incredible drinks, and even better people—despite the chilly theme, the energy stayed

Fire, Ice & Good Times Read More »

Project Spotlight: Overcoming Historic Building Challenges at the Cincinnati Waldorf School

Our team recently completed a challenging Special Projects assignment at The Cincinnati Waldorf School in Mariemont, Ohio, where our team replaced a long-inoperable steam boiler in a historic school building originally constructed in 1925. This project required detailed planning, creative problem-solving, and close teamwork to successfully restore heat to the facility. Managed by Patrick Blankenship,

Project Spotlight: Overcoming Historic Building Challenges at the Cincinnati Waldorf School Read More »

Planning Ahead: Navigating the Transition Away from LON-Based Building Automation Systems 

The building automation industry is entering a period of planned transition as LonWorks (LON) technology moves toward the end of its manufacturing lifecycle. While many LON-based systems continue to operate reliably today, recent announcements across the industry signal that now is the right time for building owners and facility managers to begin planning for the future.  At Mechanical Services

Planning Ahead: Navigating the Transition Away from LON-Based Building Automation Systems  Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.