The 2026 Polar Plunge Is Complete!

The 2026 Polar Plunge wrapped up this past weekend! The water was cold, but the weather was pretty mid, definitely better than 20 degrees and much warmer than past years.

We were so glad to have a team participate again this year, and next year it better be even bigger! If there are any organizations or companies out there interested in partnering with us for Kaiser’s Crew, we’d love to connect.

Quote from Phil Smith:

This event has a special place in my heart. It began as a cherished tradition between Mike Kaiser, our dear friend and CAD department supervisor, and his son. After his son’s passing, I had the honor of joining Mike in this Polar Plunge, a gesture of solidarity and remembrance. A year later, we lost Mike, but not before we dreamed of making this event a grand gathering, a tribute to the bonds that unite us.

This year, we grew that dream. Our team dressed up as a tourist group and joined together for the plunge. We weren’t just taking a plunge; we were diving into a celebration of life, strength, and community spirit.

Your presence at this event meant the world to me and to our community. It was more than just participation; it was a commitment to the power of togetherness and the enduring strength of friendships. This year’s Give to Grow Community event was a spectacular one, a true testament to the memories of Mike and his son, and the resilience of our community.

This year, Kaisers Crew raised $1,050 for the Special Olympics, and we’re incredibly proud of our team for supporting Phil’s passion through Give to Grow and continuing Mike’s legacy.

Thank you, Phil, for keeping Mike and his son’s memory alive through the Polar Plunge.

Overall, the Dayton-area campaign raised $19,197 toward its $25,000 goal — reaching 76% of the total.

Thank you to everyone who donated and supported the cause. We appreciate you all and can’t wait to see everyone again next year!

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.

Exciting Career Opportunities Await! Be Part of Our Growing Team!