November 2023

A Season of Thanks: MSD, Inc.’s Milestone Achievements at the Synergy Executive Forum

As the Thanksgiving season approaches, a time traditionally reserved for reflection and gratitude, we at MSD, Inc. find ourselves with abundant reasons to be thankful. It is with immense pride and humility that we share the news of our recent accolades at the Synergy Executive Forum. Our dedicated team has been honored with two prestigious

A Season of Thanks: MSD, Inc.’s Milestone Achievements at the Synergy Executive Forum Read More »

MSD, Inc.: Celebrating Excellence in Service with the VIP Partner Award from Gordon Food Services

We’ve always known that the heart of MSD, Inc. is its unwavering commitment to client satisfaction. But sometimes, it feels extra special to have those efforts recognized by those we serve alongside. Last month, a momentous occasion marked MSD’s journey as we were honored with the VIP Partner Award by Gordon Food Services at their

MSD, Inc.: Celebrating Excellence in Service with the VIP Partner Award from Gordon Food Services Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.