A Magical Night with Santa and Team MSD

What a magical night it was at MSD’s Night with Santa! Team MSD and their families, along with Santa and Mrs. Claus, came together for an unforgettable evening filled with joy and holiday spirit. This heartwarming gathering is a testament to our character as a team and what we do to engage with our families.

We indulged in sweet treats that tickled our taste buds and warmed our hearts. From cookies to hot cocoa, it was a delightful feast for all. Creativity was in the air as we crafted special holiday projects. Our artistic talents shined bright, and the results were fantastic! The kids (and kids at heart) penned heartwarming letters to Santa. Soon, these wishes will embark on a journey to the North Pole, carrying our hopes and dreams.

The best part of the night was witnessing our MSD crew come together as one big family. It’s these moments of togetherness that make the holidays truly special. As the night ended, we couldn’t help but feel grateful for this incredible evening. We’re already counting down the days until we can host this event again next year. In a nutshell, MSD’s Night with Santa was a fantastic evening filled with laughter, sweetness, creativity, and unity. We can’t wait to do it all over again next year!

Wishing you all a joyful holiday season and a fantastic year ahead.

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.