Teeing Off at Our 23rd Annual Golf Outing

What a weekend! Our 23rd Annual Golf Outing was nothing short of incredible, a record-breaking year with 70+ golfers from our team out on the course. This event is always one of our favorites, and 2025 truly delivered.

The weather couldn’t have been more perfect, the course was full of energy, and the laughs were nonstop. We had winners, we had losers, and let’s be honest, a few people who probably wished they had gotten in a little more practice beforehand. But the best part? Everyone made it through in one piece (aside from a few sore muscles Sunday morning).

What makes this event so special isn’t just the golf, it’s the time spent together. Spending a Saturday morning with this incredible group is one of the many traditions that keeps our culture strong and connected. It’s a chance to celebrate teamwork, friendly competition, and the shared joy of doing something we all love.

Of course, none of this would have been possible without the behind-the-scenes work that made the outing run so smoothly. A huge thank you goes to Miranda Dooley for her incredible organizational skills, to Sharon Baber for her support, and to Amaya Schreiber for capturing the day in photos and joining in on the fun. You all made this event shine.

And now, for the moment you’ve been waiting for — our winners! 🎉
Congratulations to Phil Smith, Bobby Elrod, Devin Fancher, and Daniel Ross for taking the top spot this year.

1st Place Team

  • Phil Smith
  • Bobby Elrod
  • Devon Fancher
  • Daniel Ross

Last Place Team

  • Cory Gray
  • Chase Fox
  • Landon Gray

Contest Winners

  • Longest Drive: Phil Smith, Sheldon Ladd
  • Closest to the Pin: Scott Barker, Matt Webb

Here’s to another successful outing, another year of laughs, and another reminder of just how lucky we are to have such a fantastic team. We’re already looking forward to the 24th!

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.