More Than a Facility Upgrade: MSD Helps Transform the Dayton Raiders Aquatic Center

A story of teamwork, innovation, and community impact that goes far beyond mechanical systems.

At Mechanical Services & Design, Inc. (MSD), we believe the work we do extends far beyond the systems we install and maintain. Every project is an opportunity to improve the spaces where people work, learn, gather, and pursue their passions. Our recent work at the Dayton Raiders Aquatic Center is a powerful example of that commitment, combining technical expertise, innovative financing, and a deeply meaningful connection to our community.

Transforming the Environment for Athletes and Families

The Dayton Raiders Aquatic Center serves as an important space for competitive swimmers, coaches, families, and spectators. Like many aquatic facilities, maintaining proper indoor air quality, humidity levels, and comfortable conditions presents unique mechanical challenges.

The facility’s aging HVAC system created an opportunity for a significant upgrade, one that would improve the indoor environment and better support the demands of competitive swimming.

MSD helped bring that vision to life through the installation of a state-of-the-art Innovent dehumidification unit, increasing airflow from approximately 4,500 cubic feet per minute (CFM) to 26,000 CFM.

This substantial improvement represents nearly six times the previous airflow capacity, providing enhanced air circulation, humidity management, and overall comfort throughout the facility.

For swimmers, coaches, and families who spend countless hours at the aquatic center, these improvements help create a healthier, more comfortable environment while positioning the facility to accommodate competitive swim meets and future events.

Innovative Solutions Through Collaboration

A project of this scale requires more than technical expertise. It also takes collaboration, creative problem-solving, and a shared commitment to finding the right solution.

MSD partnered with EBEB Solutions to utilize the Ohio Property Assessed Clean Energy (PACE) financing model, helping make the facility improvements financially achievable.

By combining an innovative financing approach with MSD’s mechanical expertise, the team was able to move forward with a substantial infrastructure investment that will serve the facility for years to come.

From project planning and equipment installation to coordination and execution, this upgrade reflects the value of bringing the right people and resources together to solve complex facility challenges.

A Special Weekend Honoring Payson’s Legacy

The significance of this project became even greater when the newly improved facility hosted the Payson Memorial Swim Meet, a heartfelt event honoring the life and legacy of Payson, the son of an MSD team member.

Throughout the weekend, the aquatic center was filled with meaningful reminders of Payson and the positive impact he had on those around him.

Personal touches, affectionately known as “Payson-isms,” were incorporated throughout the event. Heat winners received Extra gum and Skyline gift cards, thoughtful tributes reflecting some of Payson’s favorite things.

Payson’s sister, Shea, now a sophomore and member of the swim team, also participated in the special weekend, making the occasion even more meaningful for the family and the swimming community.

What began as a facility improvement project became part of something much bigger: a place where athletes could compete, families could gather, and a young man’s legacy could continue to inspire others.

Stepping Up When It Matters Most

As the facility prepared to host the memorial swim meet, an unexpected plumbing issue threatened to disrupt the weekend.

MSD’s Service Plumbing Team responded to an emergency call involving a sanitary lateral issue, quickly identifying and resolving the problem before the event.

Their responsiveness, expertise, and commitment to getting the job done ensured the facility remained operational and ready to welcome athletes, families, and spectators.

It was another example of MSD’s teams working together and stepping up when our clients and communities need us most.

Making a Difference Beyond the Project

The Dayton Raiders Aquatic Center project represents much more than an HVAC replacement. It demonstrates how thoughtful facility improvements, strong partnerships, and dedicated teams can create a lasting impact.

Through increased airflow, improved environmental conditions, innovative financing, and responsive service, MSD helped provide the Dayton Raiders with a facility better equipped to serve its athletes and community.

But perhaps the most meaningful outcome cannot be measured in cubic feet per minute or equipment performance.

It’s found in the swimmers who can continue pursuing their goals, the families cheering from the sidelines, and the memories created during a weekend dedicated to honoring Payson’s life.

At MSD, we’re proud to support the places where people gather, compete, connect, and create lasting memories.

This project is a reminder that our greatest impact isn’t always found in the systems behind the walls, but in the people and communities those systems serve.

People. Clients. Community. That’s what makes the difference.

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.

Exciting Career Opportunities Await! Be Part of Our Growing Team!